Das House

Parmet Das House arhitektuurifoto

Das Haus consisted of several architectural solutions, of which Parmet’s part was the covering of the highest part of the building with tiles made of stainless steel. A solution was developed that would visually give the impression of a standing seam panel.

Terminal D

Parmet D-terminal fassaad arhitektuurifoto

Parmet’s scope included covering the facade with hidden cassettes. Large, nearly 2×2 m, hanging cassettes with large joints for the face of the building. At the same time, the joints are also filled with a strip of aluminum composite plate.