The project involved covering a long wall with spatial cassettes made of aluminum composite and welded meshes. The challenge was pre-measurement and planning, during which production and transport along with installation had to be planned very well. The installation time was very important, as the implementation period was short and the work had to be done at night so as not to disturb the train timetables.
As a result of good planning and cooperation with the client, the object was completed quickly considering its size.